[ad_1]
Additional, he mentioned the initiatives which couldn’t be awarded primarily as a result of larger price with respect to price estimates had been retendered in subsequent tons.
Flue Fuel Desulphurisation (FGD) system to regulate air pollution is put in for 1340 MW coal-fired thermal energy capability of NTPC whereas the work in underway at 38 crops with round 60GW capability, Parliament was knowledgeable on Thursday.
Whole FGD commissioned capability of NTPC thus far is 1,340 MW, Energy Minister R Okay Singh mentioned in a written reply to the Lok Sabha.
He mentioned FGD system set up is underway at 38 crops (127 items) totalling 60GW of thermal energy basic capability of NTPC throughout the nation.
Varied businesses that are organising FGD methods are GE Energy India, BHEL, ISGEC Heavy Engineering, Larsen & Toubro, Mitsubishi Hitachi Energy Methods India, PES Engineers, TATA Tasks, Engineering Tasks India, KC Cotrell and Melco India.
The minister instructed the Home that the contracts have been awarded by NTPC to the contractors who’ve emerged because the lowest (L1) bidder venture clever via aggressive bidding after intensive reverse public sale course of and are inside NTPC’s price estimate vary.
The tendering in lot system had no influence on the value analysis course of as worth bid analysis has been carried out individually for every venture, he mentioned.
NTPC adopted the lot system to attenuate the tendering course of time with a view to awarding and assembly the timelines and accordingly, all items of NTPC had been divided into varied classes for implementation of FGD methods and new items had been tendered first adopted by outdated items, he acknowledged.
Additional, he mentioned the initiatives which couldn’t be awarded primarily as a result of larger price with respect to price estimates had been retendered in subsequent tons.
Ministry of Atmosphere, Forest and Local weather Change (MoEF&CC), vide notification dated December 7, 2015, issued the emission requirements for Sulphur Dioxide (SO2) for thermal energy crops (TPPs). Accordingly, all TPPs are required to regulate the emission ranges of SO2 inside the prescribed requirements.
NTPC energy crops had been additionally lined beneath the mentioned notification, he acknowledged.
Monetary Specific is now on Telegram. Click on right here to hitch our channel and keep up to date with the newest Biz information and updates.
[ad_2]
Source link